ISO 9001:2015
Quality management system
- Cert no.
- Specimen — issued under NDA
- Issuer
- CQM (CNAS) — pending issuance
- Valid through
- Pending
PRE-LAUNCH Entity filings in progress · early RFQs welcome
Engineering data, commerce terms, and the spec matrix are production-grade today. Real cert numbers, signed CTT authorisation, and named project references release under NDA on first qualified RFQ. See /about for the filing timeline. ·
Compliance & track record
This is the public-display layer of the partner desk. Certificate numbers, issuers, expiry dates, and project counterparty names are issuance-in-progress placeholders that mirror the production format. Signed PDFs and named references release under NDA on first qualified RFQ; for formal tender prequalification, request the verified pack.
Certificate shelf
ISO 9001:2015
Quality management system
ISO 14001:2015
Environmental
ISO 45001:2018
OH&S
ISO 37001:2016
Anti-bribery
CE / LV Directive
EU LV Directive 2014/35/EU
IEC type tests · CESI
IEC 60502-1/-2/60228
IEC fire suite
IEC 60331/60332-3/61034/60754
CCC (3C)
China Compulsory Certification
SNI 04-6629 (Indonesia)
Sucofindo LSPro · BV/BVR/BVVB/RVV/YJV/YJV22
SIRIM (Malaysia)
Malaysian standards
PSE (Philippines)
BPS · DTI PH
State Grid · Southern Grid
Approved network supplier (factory level via CTT)
Specimen layer — none of the certificate numbers above are claimed as live. Real certificate numbers, issuer letterheads, and validity windows are released only after a signed NDA on the first qualified RFQ, and only for entries that have already been issued. Independent record-level verification will then be possible on the CNAS / IECEE CB / CQC / SISPK BSN (Sucofindo LSPro) / SIRIM portals once each entry moves to issued status.
Overseas project layer (anonymised)
Contracting-party names removed pending written reference-letter consent from each counterparty. Scope and approximate metres retained as market signal. Buyers under NDA can request named project records, contracting bank, and signed BAST/Berita Acara references for due-diligence packs.
Greater Jakarta, ID
2024–2025Tier-1 MRT extension · permanent power + fire protection (anonymised)
~ 35–40 km mixed YJV / WDZA-GYJS / KVVRP (range — exact split under NDA). Contracting party named under NDA.
CIF Tanjung Priok · L/C — contracting bank under NDA
West Java, ID
2023–2024Coal-fired PLTU 1×660 MW · LV distribution lot (anonymised)
~ 40–50 km YJV22 + KVVRP + WDZA (range — exact split under NDA). Lot supplier role.
CIF Tanjung Perak · T/T 30/70
Johor, MY
2025Cross-border rail · permanent-way buildings (anonymised)
~ 18–25 km WDZA + YJV + Cat6 (range — exact split under NDA). EPC sub-supplier role.
CIF Port Klang · L/C 30 days
Cebu, PH
2024BRT Phase 1 · substations lot (anonymised)
~ 12–18 km YJV22 MV + KVVRP + BVR (range — exact split under NDA).
CIF Cebu South · T/T 50/50
Surabaya, ID
2025Ring-road LED feeder lot (anonymised)
~ 8–12 km BVVB + YJV + KVVRP (range — exact split under NDA).
CIF Tanjung Perak · T/T 40/60
Brunei Darussalam
2024Government housing LSZH retrofit (anonymised)
~ 4–6 km WDZA-GYJS + BVVB (range — exact split under NDA).
CIF Muara · Net 30
Project contexts
Southeast Asia
Factory infrastructure
Low-voltage distribution cables with clear drum schedule and project documentation.
Indonesia
Mining and utilities
Medium-voltage SNI-oriented cable shortlist with model-level verification before bid.
Global
Commercial construction
Safety-wire and flame-performance document package with standards listed for consultant review.
Next action
Ready to send drawings or a SKU list? Start RFQ.