Skip to main content

PRE-LAUNCH Entity filings in progress · early RFQs welcome

Engineering data, commerce terms, and the spec matrix are production-grade today. Real cert numbers, signed CTT authorisation, and named project references release under NDA on first qualified RFQ. See /about for the filing timeline. ·

CTTCTT Cable Partner Desk

PLN tender readiness (specimen)

PT PLN (Persero) tender — readiness posture.

This page maps the partner desk's intended posture against PLN's standard admin verification + RKS mapping. Every row is specimen until the partner-desk entity is registered in OSS-RBA + Coretax and TKDN / SNI verifiers are engaged. Do not rely on this page for tender prequalification; it is the published intent, not a current vendor record.

SPLN cable spec mapping

Partner-desk family → SPLN reference.

SPLN 43-5-1:1992

Kabel pilin udara LV (NFA2X) — overhead aluminium aerial bundled, 0.6/1 kV

Partner-desk family

Out of catalogue (CTT family is XLPE copper power; aluminium aerial is NOT in current scope)

Status

Out of scope · partner-desk does not bid SPLN 43-5-1

SPLN 41-8:1981

Kabel berisolasi PVC (NYY / NYFGbY) — 0.6/1 kV PVC copper power & armoured

Partner-desk family

YJV 0.6/1 kV is XLPE not PVC; armoured equivalent YJV22; cross-reference to SPLN 41 only on buyer request

Status

Cross-reference, not direct equivalent · partner-desk bids XLPE (SPLN 43)

SPLN 43-5-2:1992

Kabel berisolasi XLPE LV — 0.6/1 kV XLPE copper power

Partner-desk family

YJV 0.6/1 kV (LV)

Status

In scope · specimen pending SNI 04-6629 issuance per voltage class

SPLN 43-5-3:1992

Kabel berisolasi XLPE MV — 6 / 10 / 20 kV (TR/SUTM/SUTR class)

Partner-desk family

YJV22 6/10 kV armoured (specimen IEC 60502-2 entry)

Status

In scope · specimen pending per-voltage-class SNI IEC 60502-2 issuance via LSPro Sucofindo

SPLN 39-4:1981

Kabel kontrol (KVV / KVVR / KVVRP)

Partner-desk family

KVV / KVVR / KVVRP / KVV22 control cable

Status

In scope · LV control cable spec compliant

Procurement readiness checklist

DRM · e-Catalog · TKDN · P3DN · surety · RKS.

DRM · Daftar Rekanan Mampu

Specimen — application pending entity registration

DRM registration requires NPWP + NIB + Akta + SK Menkumham AHU + bank reference + last 2-yr financial statements; partner desk completes the pack on first OSS-RBA + Coretax issuance.

LKPP e-Catalog · Vendor code

Specimen — vendor code not yet issued

e-Catalog category vendor code is allocated post-DRM. Cable Pos Tarif under HS 8544 mapping is the bidding line.

TKDN posture · Permenperin 16/2011 + Permen ESDM 11/2024

Specimen — verifier engagement pending

PLN distribusi cable tender minimum is 25 % TKDN for kabel TR/SUTR, 40 % for kabel MV distribusi. Tolling-print arrangement does NOT score TKDN. Partner desk's domestic-content path requires a domestic production share through a registered PT-licensed local cable factory + Sucofindo / PT TUV NORD verification; no premature TKDN claim made.

Inpres 2/2022 P3DN · Domestic product commitment

Specimen — Pakta P3DN signed per tender

Per Inpres 2/2022, BUMN tenders prioritize Produk Dalam Negeri. Partner desk attaches the buyer-side Pakta P3DN template per bid and commits to domestic-content path once registered.

Surety bond · Performance / advance / warranty

Specimen — local bank surety arrangement pending

Performance bond 5–10 % via Bank Mandiri / BNI / Maybank surety; advance-payment bond 30 % for L/C advance; warranty bond 5 % held 12 months post-DAP. Forms attached to PI.

RKS · Rencana Kerja dan Syarat-Syarat

Specimen acknowledgement template available

Partner desk acknowledges the project-specific RKS section-by-section in the bid pack: scope, drawings, voltage class, ampacity, test reports, packaging, marking, delivery, warranty, dispute. Sample RKS acknowledgement template released under NDA at first qualified RFQ.

Pakta Integritas (LKPP / KPK)

Signed per tender · LKPP baku template

Per-tender Pakta Integritas signed using the LKPP baku template (KKN renunciation + BPK/BPKP/KPK audit consent + blacklist consent). Gratifikasi reported within 30 days per KPK PER-02/2014.

PPATK / DTTOT / DPPSPM screening

Run on first qualified RFQ

Partner desk screens against PPATK + DTTOT + DPPSPM per UU 8/2010 + PERPRES 33/2024, in addition to OFAC / UN / EU / HMT / WB-ADB-AIIB cross-debarment.

RKS scope references

Sample RKS section mapping

Section 3 (Scope) · Section 4 (Drawings) · Section 5 (Spec) · Section 6 (Test reports) · Section 7 (Packaging + marking) · Section 8 (Delivery + Incoterm) · Section 9 (Warranty) · Section 10 (Dispute)

TR (Tegangan Rendah)

0.4 kV · BV / BVR / BVVB / RVV / YJV 0.6/1 kV

SUTR (Saluran Udara Tegangan Rendah)

Overhead LV — out of partner-desk current scope

SUTM (Saluran Udara Tegangan Menengah)

Overhead MV — out of partner-desk current scope

JTM (Jaringan Tegangan Menengah)

Underground MV distribution 6/10 · 12/20 kV · YJV22 armoured (specimen)

Per-tender RKS acknowledgement, SPLN spec cross-reference, TKDN scoring sheet, surety-bond template, and Pakta P3DN draft are released under NDA at first qualified RFQ.

HS 8544 Pos Tarif per cable family

10-digit Indonesia HS code + tariff posture.

Per BTKI 2022 (Buku Tarif Kepabeanan Indonesia). MFN duty per PMK 26/2022 jo. PMK 96/2023; ACFTA Form E (China-ASEAN) per PMK 31/2022 typically reduces to 0 %. PPh22 Pasal 22 Impor per PMK 41/2022 (2.5 % API-U / 7.5 % non-API). VAT 11 % per UU HPP 7/2021.

FamilyPos TarifMFNACFTA Form ELARTASSNI wajibPI Kemendag
BV / BVR copper building wire 450/750 V8544.49.21.005 %0 % (with Form E)yesyesrequired
BVVB flat building cable 450/750 V8544.49.22.005 %0 % (with Form E)yesyesrequired
RVV / ZR-RVV flexible cable 300/500 V8544.49.31.005 %0 % (with Form E)yesyesrequired
WDZA-GYJS LSZH safety wire 125 °C8544.49.29.005 %0 % (with Form E)yesnorequired
YJV 0.6/1 kV XLPE power cable8544.60.10.005 %0 % (with Form E)yesyesrequired
YJV22 0.6/1 kV & 6/10 kV armoured power cable8544.60.90.005 %0 % (with Form E)yesyesrequired
KVV / KVVR / KVVRP / KVV22 control cable8544.49.41.000 %0 %nononot-required
Cat5e / Cat6 industrial LAN cable8544.42.91.000 %0 %nononot-required
YFD prefabricated branch cable8544.60.10.005 %0 % (with Form E)yesyesrequired

For each LARTAS row, PI Kemendag is required before B/L issue. SNI wajib lots require Pre-Shipment Inspection (LS — Laporan Surveyor) by Sucofindo / SGS / Surveyor Indonesia / Carsurin before customs eligibility.

Bea Cukai clearance timeline

PIB → jalur → LS → SPPB.

Per PER-32/BC/2022 jalur classification and PMK 219/PMK.04/2019 AEO. Typical windows for Tanjung Priok (JICT / TPK Koja) and Tanjung Perak are shown below. Jalur Merah (red lane, physical inspection) is the default for first-time importers without AEO MITA.

PIB submission (Pemberitahuan Impor Barang)

T+0 to T+3

Submitted via CEISA / INSW. Must arrive at Bea Cukai within 3 working days of B/L date.

Jalur classification

T+0 to T+1

Automatic on PIB. Jalur Hijau (green, AEO MITA / low risk) — release on PIB acceptance. Jalur Kuning (yellow) — document audit. Jalur Merah (red, high risk / first import / SNI wajib without LS) — physical inspection.

LS (Laporan Surveyor) — if SNI wajib

T+3 to T+10

Pre-shipment SNI verification by Sucofindo / SGS / Surveyor Indonesia / Carsurin. Required for cable categories on Permenperin 5/2019 SNI wajib list. LS issued ~ 5 working days after SNI marking inspection.

Bea Cukai eligibility audit

T+1 to T+5

BM (MFN duty) + ACFTA Form E preference verification + PPh22 + VAT calculation. AEO MITA holders typically T+1; PPJK first-import non-AEO T+3 to T+5.

PIB approval / SPPB issuance

T+5 to T+14

Jalur Hijau ~ T+3; Jalur Kuning ~ T+5 to T+7; Jalur Merah ~ T+10 to T+14. SPPB = Surat Persetujuan Pengeluaran Barang (release order).

Container pickup at port

T+5 to T+18

Tanjung Priok JICT / TPK Koja: typically same day as SPPB. Storage charge after T+18 from cont. discharge date.

Tanjung Priok worked CIF (specimen)

YJV22 3×185 mm² 12/20 kV armoured~ 3.5 km on 4 × ~ 900 m drums (FCL 40HC realism: drum OD ~ 1.6 m flange + ~ 8 t per drum; 4 vertical-stowed drums fit one 40HC, ~ 0.8–0.9 km per drum for 3×185 12/20 kV).

FOB → CIF

Copper baseline
LME baseline (specimen) — refreshed at PI
FOB Shenzhen
Specimen FOB / locked at PI
Ocean freight
Specimen — FCL 40HC Shenzhen → Tanjung Priok ~ USD 700–1,400 per container (vendor + season)
Marine insurance
0.18 % of CIF (typical Allianz / Sinarmas rate)
CIF Tanjung Priok
CIF Tanjung Priok = FOB + freight + insurance (locked at PI)

Landed cost adders

BM (MFN)
MFN 5 % of CIF (ACFTA Form E reduces to 0 % when CO/Form E ships with the lot)
VAT
11 % of (CIF + BM)
PPh22 (API-U)
2.5 % of (CIF + BM) — with API-U; PMK 41/2022
PPh22 (non-API)
7.5 % of (CIF + BM) — without API; PMK 41/2022
PPJK fee
PPJK service fee Rp 1.5–3 jt per PIB (depending on broker)
Storage / Demurrage
After T+18 from container discharge: Rp ~250–400k / TEU / day at JICT / TPK Koja
Bank L/C charge
L/C issuance + acceptance ~ 0.15–0.30 % of L/C value (Mandiri / BCA / BNI)

Copper-tail clause: Copper-tail clause for 60–90 d MV lead time: re-quote trigger at LME swing ≥ ±5 % from PI-locked baseline. Adjustment = conductor weight (kg/km) × line length (km) × ΔLME (USD/t) × FX(PI date). For YJV22 3×185, conductor weight ≈ 5.3 t/km; a 10 % LME swing on 3.5 km of cable ≈ ~ USD 1,800–2,200 differential at LME baseline USD 9–10k/t. Buyer / seller split documented on PI Section 7.

API-U status reduces PPh22 from 7.5 % to 2.5 %; for a USD 100k EPC lot that's a ~ USD 5,000 swing. Cable importer should secure API-U before first import or contract a PPJK with API-U. Kurs pajak Menkeu KMK published every Wednesday and effective Wed–Tue of the following week per PMK 219/PMK.04/2019 Art. 8; the PI cites both BI middle rate (pricing) and KMK rate (customs valuation) to avoid PIB rejection.

Indonesia port comparison

Tanjung Priok · Perak · Belawan · Makassar · Muara.

Customs-day windows assume Jalur Kuning typical case per KPU Bea Cukai. PER-32/BC/2022 jalur classification + PMK 219/2019 AEO apply across Indonesian ports; Brunei Muara is under RCED.

PortKPU BCBest forCustoms windowNotes
Tanjung Priok (Jakarta)KPU Bea Cukai Tipe A Tanjung PriokAll cable families bound for Greater Jakarta + Banten + West Java EPC; JICT / TPK Koja + Koja Container TerminalJalur Hijau T+1–2 / Kuning T+3–7 / Merah T+10–14Largest port — densest broker market + LCL consolidation. Default for first-time importers.
Tanjung Perak (Surabaya)KPU Bea Cukai Tipe A Tanjung PerakEast Java / Central Java EPC, PLTU coal-fired (Indramayu / Paiton / Rembang), industrial parks (Pasuruan / Kediri)Jalur Hijau T+1–2 / Kuning T+3–6 / Merah T+8–12Faster than Tanjung Priok for jalur kuning; less congested. Good for FCL drum cable.
Belawan (Medan, North Sumatra)KPU Bea Cukai Tipe B BelawanSumatra distribusi LV, palm-oil estate cabling, PLN Sumut/Sumbar; some Aceh + Riau lotsJalur Hijau T+2 / Kuning T+5–8 / Merah T+10–15Type B office is slower paper-wise; budget extra clearance days. Direct China feeder service available.
Makassar (Soekarno-Hatta, South Sulawesi)KPU Bea Cukai Tipe B MakassarEast Indonesia projects (Sulawesi / Maluku / Papua); mining-belt power distribution + smelter feedersJalur Hijau T+2 / Kuning T+6–10 / Merah T+12–18Long handling window. Transshipment via Tanjung Perak is often cheaper unless the project is local.
Muara (Brunei Darussalam)Royal Customs and Excise Brunei (RCED)JKR Brunei + oil-and-gas service contractors based in Bandar Seri BegawanRCED green channel typical T+2–4Out of Indonesia's UU 17/2006 customs regime; ASEAN-Form D / ACFTA Form E rules differ. Use a Brunei-licensed broker.

Next page

Privacy notice + terms covering PLN-bound RFQ data flow.